At E.E. Limited every member of the workforce is conscious of the fact that we do not sell merchandise to our clients but services which are essential to the businesses of our diverse clients. We are able to meet the most stringent of quality procedures demanded by clients because we maintain a discipline of consistent quality control safety and the best industry practices.


We have served Noble Drilling Nigeria Limited in various capacities as a reliable service provider to enable them achieve tactical and strategic advantages in their chosen areas of operation. Our esteemed clients include the following:

1. RIG NN – 1 ( AMT SUPPORTED INLAND JACK –UP)

• Replacement of damaged jacking pinholes on all four legs
• Repairs to wasted sections of the 6 feet diameter tubular legs by strapping
1” X 6” flat bars at 45 degrees and 30 degrees
• Replaced about 30 % of wasted hull plates and stiffeners

2. DON WALKER (Offshore Jack-Up)

• Replacement of about 70% of wasted pre-load tanks stiffeners and hull plates and Repairs to damaged rig’s spud cans that involved removal of plates. V stiffeners change-out and installation of anodes.
• Complete change-out of elevated pipe deck plating and Maintains a running contract on supply of ABS certified welders to the rig.


3) PERCY JOHNS (Offshore Jack –Up Rig)

• Repairs to damaged rig leg bracings and Complete repairs to damaged raw water tower as well as Complete modification of the conditioning system.
• Maintains a running contract on supply of ABS certified welders to the rig for Repair & General maintenance work on Rig
• Construction of 25’ Drive Pipe Deck and Installation of Platform.
• Fabrication and installation of Cutting Area Walkway
• Construction of EOM TRIP TANK


4) TOMMY CRAIGHEAD (Offshore Jack-Up Rig)

• Major plate and stiffener change-out on pre-load tanks while Drilling
• Repair of several damaged crane boom pipes and walkways
• Installation of Ten (10') feet cantilever Beam extension. Major repairs, re-fabrication and installation of the 10' Cantilever Beam Skidding Extension on the rig while on location drilling. This provided the capability for the offshore jack-up rig to be able to Skid-Out up to fifty feet (50') over a group of wells on a platform. This job was carried out in conjunction with SUPERIOR ENGINEERING SERVICES HOUSTON, USA.
All our welds were NDT to zero defect.
• Maintains a running contract on supply of ABS certified welders to the rig.

3. ROY BUTLER (Offshore Jack-Up Rig)

• Replaced about 20% of wasted plates in Hull pre-load tanks
• Maintains a running contract on supply of ABS certified welders to the rig for general Hull repairs and fabrications.
• Construction of Mud conditioning Tank and Mud discharge channel.
• Shale shake roof platform construction and installation
• Construction of oil water separation system for Zero discharge system
• Construction of 25 BBL. Rig Floor Skimmer Tank.

Tidex; ExxonMobil; Noble; Sub Sea Inspection Services Nonle Drilling; Mining